Filed in person at the Florida Department of State

Name Change Order Apostille for India.

Start Online Order (850) 900-3443
$220
Per Document
State fee and U.S. shipping included.
5–7
Business Days
Filed in person in Tallahassee.
2005
Hague member since
No embassy step needed.
+$100
Ship to India
Flat, per order.

Quick answer

Name changes collide with Indian records all the time: a married name on the U.S. One Florida apostille is all the U.S. side needs — $220, 5–7 business days.

Issued by
The Clerk of the Circuit Court in the Florida county where the name change was granted, as a certified copy of the final judgment of change of name (section 68.07…
Florida state fee
$20 — included in $220
Route
Apostille only — Hague member since 2005
Online notarization
Not applicable — needs a certified copy
Consulate serving Florida
Consulate General of India in Atlanta
Translation
Florida documents are in English, which Indian authorities use, so translation is rarely needed.

How a Florida name change order is used in India

Name changes collide with Indian records all the time: a married name on the U.S. passport, a maiden name on Indian property or bank records, a dropped middle name on an OCI card. A Florida court order changing your name, certified by the Clerk of Court and apostilled, is strong proof that links the names for OCI updates, Indian banks and property mutation. Many Indian offices also expect a name affidavit or a newspaper notice in India, so ask which combination they accept.

Getting a name change order Florida will apostille

A certified copy of the final judgment of change of name with the clerk's original certification and seal or official e-certification, complete with the judge's signature page. The former and new names must match your other records exactly. The state fee is $20, included in our price.

Request it from the clerk of the county that granted the change, online, by mail or at the counter. If you were born in Florida, the change is reported to Vital Statistics, and many foreign offices also want an updated certified birth certificate from VitalChek or the Bureau. Clerk and Vital Statistics fees are not included in our $220.

State fee for this document: $20 — included in our price. Full details on the name change order apostille page.

Who receives it in India — and translation

The OCI system and the Consulate General of India in Atlanta (which serves Florida) handle OCI and consular matters; sub-registrars and state stamp authorities handle property documents; Indian banks handle KYC and inheritance claims; the Ministry of Corporate Affairs handles company filings; Marriage Officers handle Special Marriage Act weddings; and CARA handles adoptions from India.

Florida documents are in English, which Indian authorities use, so translation is rarely needed. When a document is in another language, our rule applies: a translation certified by the translator, notarized by a different notary and apostilled in Florida. The OCI FAQ asks for an authorized English translation only for certificates not in English.

India has no general expiry for apostilled documents. Specific timing rules apply instead, such as stamping a power of attorney within three months after it first reaches India; banks and courts may also want recently issued copies.

Consular office serving Florida: Consulate General of India in Atlanta.

Four steps, one week

  1. Order online

    Pick the document and destination country on the order form and pay by card. After we review your documents, FedEx emails you a prepaid label.

  2. Send your document

    Drop the envelope at any FedEx location.

  3. We file in person

    We review it, then walk it to the Florida Department of State in Tallahassee for the apostille.

  4. Returned to you

    Back in 5–7 business days — anywhere in the U.S., or abroad for a flat $100.

Why name change orders get rejected

  • Hearing copy, scan or attorney copy instead of the clerk-certified judgment
  • Notarized photocopy of the judgment
  • Missing pages
  • Wrong document: a name restored in a divorce is shown by the divorce judgment

What it costs for India

$220 per document, $380 for two and $160 each for three or more — the state fee, request form, in-person filing in Tallahassee and FedEx shipping inside the U.S. are included. Shipping the finished apostille to India is a flat $100 per order.

Not included: whatever the issuing office charges for the certified copy or certificate, and notarization (online notarization is $40 for the first document — $10 notarization fee + $30 technology platform fee — and $20 for each additional one).

Common questions

It's strong proof, apostilled. Some Indian offices also want a name affidavit or a published notice in India, so ask the specific office before you order.
No. A former name restored in a divorce is part of the final judgment of dissolution of marriage, so that judgment is the document to apostille.
Many foreign offices want both. If you were born in Florida, order a fresh certified birth certificate and apostille it with the judgment: two documents are $380.
Yes. Choose international return at checkout: a flat $100 per order, tracked international shipping to any address in India. Shipping inside the U.S. is included.
Not on the U.S. side — no embassy or consulate legalization. India may still ask for a translation; as a rule it should be certified by the translator, notarized and apostilled too.

Skip the paperwork. We file every order in person.

$220 per document — state fee, form, in-person filing and FedEx return shipping included. International return +$100 flat. 5–7 business days.

Call Now Order Now